The Beechwood Road Environmental Centre will include a new, state-of-the-art, environmentally engineered landfill that will receive materials that cannot be diverted towards re-use, recovery or recycling.
A New, Environmentally Engineered Landfill
The new landfill will be constructed on a new area of the current site, using the latest technology and processes to ensure the highest available standards of safety and efficiency. This will include a liner system, leachate collection and monitoring system to continuously protect ground and surface water. A gas collection system to capture the landfill gas will also be included.
The new landfill will accept a significantly smaller amount of waste than was previously proposed.
When the Beechwood Road Environmental Centre begins operations, the existing landfill will be closed, capped with natural grasses and monitored. The community will be consulted on possible future uses for the closed facility.