Healthcare
© 2026 WM Intellectual Property Holdings, L.L.C.
Sitemap |
Privacy Policy|
Terms of Use|
Disputes/Arbitration|
Accessibility
Your Privacy Choices
Waste Management HomeOfficial primary logo of WM
Open menu

Facility Expansion

Proposed Plans

To better serve the surrounding communities and their business needs, WM is proposing to extend its hazardous waste operations. The proposal seeks the following approvals:

  • Authorization to increase the capacity at the existing hazardous waste landfill (B-18 landfill).
  • Authorization to construct a new hazardous waste landfill (B-20 landfill) to open once B-18 landfill has reached capacity.
Subsequent Environmental Impact Report (SEIR)

Extensive studies were conducted by CH2M Hill, an independent engineering and consulting firm, to analyze the environmental impact of WM's proposal. The findings — which include an analysis of air and water quality, hydrology, traffic, along with project impacts and mitigations — are available in a Subsequent Environmental Impact Report (SEIR).

Project Documents

  • Draft SEIR Executive Summary (March 2008) (pdf)
  • Revised Project Description Executive Summary (May 2008) (pdf)
  • Recirculated DSEIR Executive Summary (May 2009) (pdf)
  • Final SEIR - Clarifications and Corrections (September 2009) (pdf)
  • BFI Amendment Notice (March 2012)