Healthcare
© 2026 WM Intellectual Property Holdings, L.L.C.
Sitemap |
Privacy Policy|
Terms of Use|
Disputes/Arbitration|
Accessibility
Your Privacy Choices
Waste Management HomeOfficial primary logo of WM
Open menu

Reports

Recent Communications

WM Notice to Interested Parties - May 29, 2025

WM Notice to Interested Parties – December 11, 2024

WM Notice to Interested Parties – November 14, 2024

WM Notice to Interested Parties - July 30, 2024

WM Notice to Interested Parties - May 30, 2024

WM Richmond Landfill Post-Closure EMP – April 2024

WM Notice to Interested Parties – June 23, 2023

Update and Results Related to March 2023 Leachate Release – June 14, 2023

WM Notice to Interested Parties – June 7, 2023

WM Richmond Landfill Leachate Release Notification – March 30, 2023

WM Public Notice – March 27, 2023

WM Notice to Interested Parties March 27, 2023

WM Response to Comments on ECA Amendment Applications – January 27, 2023

 

Archived Communications (2013-2022)

 

Public Liaison Committee Meeting Minutes

PLC Meeting Minutes – June 18, 2025

PLC Meeting Minutes – July 11, 2024

PLC Meeting Minutes – November 02, 2023

PLC Meeting Minutes – March 14, 2023

PLC Meeting Minutes – July 6, 2022

PLC Meeting Minutes – December 7, 2021

PLC Meeting Minutes – September 28, 2021

 

Addendum to 2012 and 2013 WSP Annual Monitoring Report

Addendum

 

Assessment of LFG Vertical Migration

July 2015 (pdf)

May 2015 (pdf)

July 2014 (pdf)

 

Air Emission Survey

May 2014 (pdf)

 

Chronology reports

Chronology of Significant Landfill Design & Operations & Land Use Changes

 

Historical Data

Ground Water 2021 (pdf)

Surface Water 2021 (pdf)

Leachate 2021 (pdf)

Domestic Wells 2019 (pdf)

 

Operations Reports

Odour Management Plan Revision 1 Mar 2012 - (13 MB)
Stormwater Contingency Plan March 2012 - (16 MB)

Letter to Local Residents - Sept 23, 2011

Emission Summary and Dispersion Modelling Report - Sept 19, 2011

  • Part 1 (pdf)
  • Part 2 (pdf)
  • Part 3 (pdf)

Acoustic Assessment Report  - Sept 19, 2011

  • Report
  • Appendices

Certificate of Analysis - Pond Results (pdf)
WM Phytoremediation Plan 2010 (pdf)

 

Site Conceptual Model Report

Appendix_A - WMCC_Richmond_BH_Logs_Sep09 (pdf)
Appendix_B - Summary_of_Hydraulic_Conductivity_Measurements (pdf)
Appendix_C - Summary_of_Well_Completion_Data (pdf)
Appendix_D - 2009_Supplemental_Hydrogeology_Investigation (pdf)
Appendix_E - VOC_Data (pdf)
Appendix_F - WMCC_Richmond_Database_KB5691-11_Sep09.mdb (pdf)
Appendix_G - Richmond_Landfill_Hydrogeologic_Investigations_Bibliography (pdf)
Appendix_H - Mathematical_Modelling_of_Solute_Transport_in_Rock_Fractures (pdf)
KB5691-11_FINAL_Cover_Text_Figures_Tables_Oct2009 (pdf)

 

Comments on Site Conceptual Model Report

MOE Conceptual Model Report Memorandum - February 2010 (pdf)

Franz Final Report February 3 (pdf)

Ministry Correspondence

POO Response Jan 2011 (pdf)
Industrial Sewage Inspection Report Response - Jan 28, 2011 (pdf)
Solid Non-Hazardous Waste Disposal Inspection Report - Jan 28, 2011 (pdf)

 

Applications submitted to Ministry of the Environment

ECA Application Modifications to Leachate Storage System – April 30, 2020
Application for ECA Amendment - Forcemain to Leachate Holding Lagoon – April 15, 2020
ECA Application for Amendment to ECA re; Leachate Storage System
ECA Amendment Application Nov 2014 (Odour Monitoring Plan)
Letter to residents re: November 2014 application
Application to ECA 13-September-12 (pdf)
Application for Transfer Station - Waste 25-May-11 (pdf)
Application to Amend ISW 25-May-11 (pdf)
Application to Continue Recyclables Disposal 25-May-11 (pdf)

 

Ministry of the Environment , Richmond Landfill Site , XCG, WM & MOE Comments, October 2009

Regional_Comments_on_XCG_Richmond_Landfill_Odour_Model_XCG (pdf)
Regional_GW_Comments_on_the_XCG_Reports (pdf)
Regional_SW_Comments_Richmond_WDS_Public_Comments_Review (pdf)
WM_Napanee_LF_RWDI_Review_Rpt_Revised_XCG_Air_Model_10 Aug 09 (pdf)
WMCC_Comments_re_XCG_Review_Draft_Amendment_and_Closure_Plan (pdf)
WMCC_Comments re_XCG_Review_Surface_Water_and_Groundwater (pdf)
XCG_Revised_Air_Model_Report_6 Aug_09 (pdf)
XCG_Comment_Letter_re_C_of_A_Amendment (pdf)
WMCC_Air_Model_Napanee_LF_Final_Rpt_RWDI_Peer_Rev_XCG_AERMOD (pdf)
XCG_Original_Air_Model_Map_Attachment_C (pdf)
XCG_Original_Air_Model_Report_Attachment_A_Windroses (pdf)
XCG_Original_Air_Model_Report_Attachment_B_SCREEN_3 (pdf)
XCG_Original_Air_Model_Report_LR16641703_29_May_09 (pdf)
XCG_Surface_and_Groundwater_090330B09-08757_(i)_R (pdf)
XCG_Surface_and_Groundwater_090330B09-08757_(ii)_R (pdf)
XCG_Surface_and_Groundwater_2009224 (pdf)
XCG_Surface_and_Groundwater_B09-06857_R (pdf)
XCG_Surface_and_Groundwater_B09-09187_R (pdf)
XCG_Surface_and_Groundwater_B09-09352_R (pdf)
XCG_Surface_and_Groundwater_FR16641703-090529 (pdf)
XCG_Surface_and_Groundwater_Photo (pdf)
EAAB_Comments_on_Air_Modelling_Report (pdf)
WM_Napanee_LF_RWDI_Peer_Rev_Rpt_Air_Model_XCG_29_May_09 (pdf)
XCG_Peer_Review_Letter_v3 (pdf)
XCG_Response_to_MOE_and_WM_Comments (pdf)

 

Interim Hydrogeological Reports

The following interim reports are based on an ongoing hydrogeological study to develop a new Environmental Monitoring Plan as part of the Closure Plan for the Richmond Landfill. We are currently working on a resolution which we hope will be finalize soon.

2006_Field_Work - Final Report - Oct08_1 of 2 (pdf)
2006_Field_Work - Final Report - Oct08_2 of 2 (pdf)
Density effects on head Memo to CP - 16 Dec 08 (pdf)
GW Flow 3-10mbBR Zone_Memo to CP - 16 Dec 08 (pdf)
Structural Trends_Memo to CP - 16 Dec 08 (pdf)
Updated Information OW57_Memo to CP - 22 Jan 09 (pdf)
GW Flow 3-10mbBR Zone_Memo to CP - 22 Jan 09 (pdf)
MOE Comments re-Cl trends _Memo to CP - 18 Nov 08 (pdf)

 

Annual/Semi Annual Reports

  • Richmond Landfill 2024 Fall Semi-Annual Report – January 2025
  • Richmond Landfill 2024 Spring Semi-Annual Report – July 2024
  • 2023 Annual Monitoring Report #37 – prepared by WSP Canada Inc
  • Richmond Landfill 2023 Fall Semi-Annual Report –January 2024
  • Richmond Landfill 2023 Spring Semi-Annual Report – July 2023
  • 2022 Annual Monitoring Report #36 – prepared by WSP Canada Inc.
  • Richmond Landfill 2022 Fall Semi-Annual Report – January 2023
  • Richmond Landfill 2022 Spring Semi-Annual Report – July 2022
  • 2021 Annual Monitoring Report #35 – prepared by WSP Canada Inc
  • Richmond Landfill 2021 Fall Semi-Annual Report – January 2022
  • Richmond Landfill 2021 Spring Semi-Annual Report – July 2021
  • 2020 Annual Monitoring Report #34 – prepared by WSP Canada Inc
  • Richmond Landfill 2020 Fall Semi-Annual Report – Jan 2021
  • Richmond Landfill 2020 Spring Semi-Annual Report – July 2020
  • 2019 Annual Monitoring Report #33 – prepared by WSP Canada Inc
  • Richmond Landfill 2019 Fall Semi-Annual Report – Jan 2020
  • Richmond Landfill 2019 Spring Semi-Annual Report – July 2019
  • 2018 Annual Monitoring Report #32 – prepared by WSP Canada Inc
  • Richmond Landfill 2018 Fall Semi-Annual Report – Jan 2019
  • Richmond Landfill 2018 Spring Semi-Annual Report – July 2018
  • 2017 Annual Monitoring Report #31 – prepared by WSP Canada Inc
  • Richmond Landfill 2017 Fall Semi-Annual Report – January 2018 
  • Richmond Landfill 2017 Spring Semi-Annual Report – July 2017 
  • Richmond Landfill 2016 Fall Semi-Annual Report – January 2017
  • Richmond Landfill 2016 Spring Semi-Annual Report – July 2016
  • 2015 Spring Report - prepeared by BluMetric
  • Richmond Landfill 2015 Fall Semi-Annual Report - January 2016
  • 2014 Annual Monitoring Report - prepared by WSP Canada Inc
  • 2014 Fall Semi-Annual Report - prepared by BluMetric
  • 2014 Spring Semi-Annual Report
  • WESA Spring 2012 Semi-Annual Report - July 2012

  •  

    WSP Canada Inc (formerly Genivar) 2014 Annual Monitoring Report

  • Annual Monitoring Report #28
  •  

    WSP Canada Inc (formerly Genivar) 2013 Annual Monitoring Report

  • Annual Report #27
  •  

    2013 Blu Metric Semi-Annual Report

  • Fall 2013 Fall Semi-Annual Report (pdf)
  • Spring 2013 Semi-Annual Monitoring Report (pdf)
  •  

    2012 Genivar Annual Report

  • Annual Report
  •  

    2011 Genivar Annual/Monitoring Report

  • Annual Report
  • Appendix A1
  • Appendix A2.1 to A2.2
  • Appendix A2.3 to A2.10
  • Appendix A2.11
  • Appendix A2.12 to A2.15
  • Appendix A3
  • Appendix A4
  • Appendix A5, A6 and A7
  • Appendix A8 and A9
  • Appendix B, C, D and E
  • Complete Annual Report-(22 MB filesize)
  • 2011 Fall Semi Annual Report (pdf)
  • 2011 Spring Semi Annual Report (pdf)
  • 2010 WESA Annual Report (pdf)
  •  

    2010 Genivar Annual Report

  • Annual Report
  • Appendix A1 - (11 MB)
  • Appendix A2, A3 and A4 - (6 MB)
  • Appendix A5 and A6 - (11 MB)
  • Appendix B, C, D, E, F and G - (2.5 MB)
  • Complete Annual Report - (30 MB filesize)
  • 2012 WESA Fall Semi Annual Monitoring Report
  • 2010 Fall Semi Annual Report (pdf)
  • 2009 WESA Annual Monitoring Report (pdf)
  • 2009 Genivar Annual Monitoring Report (pdf)
  • 2008 H&P Annual Monitoring Report (pdf)
  • 2008 H&P Site Drawing (pdf)
  • 2008 WESA Annual Monitoring Report (pdf)